Global technology, grounded in Africa.Reported from London · Connected to the world

The four desks

Stories & formats

More

Find a published story by title, subject or author.

african tech

Telkom plans satellite backup. Ask what happens when the main link drops

Telkom’s Amazon Leo agreement puts satellite beside fibre and mobile for eligible South African sites. Start with the outage you need to survive and treat 2027 as a commercial target.

Watch this report

Read the report and video transcript

Media credits, sources and reuse details ↓

A satellite dish at a South African work site could give it a second way online. The question is what will stay usable after the first route fails. Telkom’s 17 November agreement with Amazon Leo puts that option on the table for eligible customers. Its interim presentation sets a 2027 commercial target, subject to readiness and applicable approvals. For a team planning next year’s connectivity, the useful work starts with a site list and an outage test.

Separate three jobs for the satellite link

Telkom’s interim presentation gives the network three jobs. It can reach remote sites where ground networks fall short, add a second path alongside fibre, mobile or fixed wireless, and connect fixed mobile base stations back into the wider network. That last job is backhaul. A tower may reach the operator over satellite while a nearby device continues to use its usual mobile radio link. The announcement describes the tower connection. It offers no date or handset list for direct satellite service.

Ask who takes the call

Openserve signed for the Telkom Group and says it will remain the service provider for customers it supplies directly or through authorised agents. The announcement also puts satellite into BCX’s managed enterprise and public-sector bundles and assigns Telkom Business the small-business route. A shared satellite network can therefore sit behind several offers. Whichever offer you are considering, ask which company takes a support call, installs the terminal and owns the switch-over test.

Write an outage test for the site

Start with a realistic failure. If the fibre drops at a warehouse, decide whether dispatch can keep sending stock updates. If the power goes too, ask which equipment has a backup supply and how long it can carry the critical load. For a site with no viable main link, ask for a trial of the essential workload from the actual installation location. These are commissioning questions you can prepare before an operator quotes.

In a mixed South Africa–UK operation, have the local site and UK support desk count the same interruption from the last successful transaction to the first successful one on the backup. Record the time to return to the main link as well. Ask about application performance during congestion and any data limits. A link check alone can miss an application that got stuck when the route changed.

Keep the 2027 target separate from the order

Telkom says it will give more details on service availability and approved sales channels closer to launch. Its current documents do not name a date for individual sites or publish a price list for the offers. Use the target to plan questions and ask for the exact address, service terms and support arrangement in writing when offers are available. Announcement date · Read PING!’s guide to tracing the network behind an access result

Video transcript

Telkom plans a satellite option for eligible sites in South Africa. A backup link only helps if your site can switch to it. Ask who checks the switch and what keeps running when the main link drops.

Sources and disclosures
Disclosure
This guide uses Telkom’s public announcement and interim presentation, with AI-assisted drafting. PING did not test the service or measure a connection. The cover is an original example, with no supplier imagery. The accompanying PING video uses local Kokoro British Emma synthetic narration with timed captions.
Declared media rights
Owned by PING!
Sources and method
Telkom’s media centre dates the agreement announcement 17 November 2026. The 2027 commercial target appears on page 36 of its FY2027 interim results presentation. The public sources were retrieved on 21 November. The diagram shows example paths and the test questions are PING’s. Cover: An example of a second path in Telkom’s Amazon Leo plan. Telkom targets commercial availability in 2027. Original PING! Magazine diagram, based on Telkom’s announcement and interim presentation. Video: A 13.5-second original PING! video about testing a satellite backup. Original PING! Magazine diagram and edit, based on Telkom’s public documentation. Local Kokoro British Emma synthetic narration. Media provenance: Video -- Generated illustration. Cover -- Owned by PING!.

Reader comments

Comments are not open yet. When available, submissions will require free sign-in and editorial approval before appearing. PING does not promise a response.

Privacy information